| Pollution Control Board |
SC03001 |
Consent to Establish Under Air and Water Act(NOC) |
1. A covering requisition letter stating the status of the industry and activities clearly. 2. Copy of attested sale Deed Lease Deed or any other relevant documents as proof to ensure possession of the site factory for which application is made by the applicant. 3. Copy of attested Memorandum of Articles in case of PublicPrivate sectors or registered partnership deed in case of partnership company. 4. Layout plan showing the location of various process equipment utilities like boiler generator etc effluent treatment plant outlet location non-hazardous and hazardous waste storage yard. 5. Schematic diagram showing the distance of water bodies roads existing proposed residential areas agricultural lands important religious locations educational institutions ancient monuments archeological places and other sensitive areas for 2 KM. radius from the units. 6. Detailed manufacturing process for each product along with detailed process flow chart. 7. Details of Water Balance and wastewater balance for process. 8. Details of Material balance for each products and process. 9. Land use classification certificate as obtained from the competent authority of the Uttar Pradesh. 10. Auditors Certificate with break up details for the proposed Gross fixed Assets duly certified by a Chartered Accountant along with the financial provisions for Pollution Control Measures. 11. Consent fee under Water and Air Acts payable to the Board. 12. Ground water clearance obtained from the competent Authority (If applicable). 13. Sewage Treatment Plant (STP) proposal which must contain details of design characteristics of sewage treatment methodology mode of disposal design criteria for various units detailed drawing of STP and its layout diagram showing the hydraulic profile and mode of disposal of treated sewage and its adequacy (If applicable). |
Capital Investment Fees (Amount in Lakhs)... (full fee details as per original data) |
Step-1: The applicant shall open the Online Single Window Portal using the address... (full steps as per original data) |
Step 1 to Step N to be completed in X Days (As per Act) |
Orange and Green - Regional Office Red - Head Office |
Not applicable |
Not applicable |
| Pollution Control Board |
SC03002 |
Consent to Operate under the Air (Prevention and Control of Pollution) Act 1981 |
1. A covering requisition letter stating the status of the industry and activities clearly. 2. Details of production capacity... (full comp doc list) |
Capital Investment (Fixed Assets Current Assets - Current Liabilities)... (full fee details) |
Step-1: The applicant shall open the Online Single Window Portal... (full steps) |
Step 1 to Step N to be completed in X Days (As per Act) |
Orange and Green - Regional Office Red - Head Office |
Not applicable |
Not applicable |
| Registrar Firms Societies and Chits |
SC12001 |
Registration of Partnership firms |
Details and Address proof of firm. Details and Address proof of partners. Notarised Partnership Deed with partners photo... |
Rs-5001. |
STEP 1: For firm registration visit Niveshmitras website https://niveshmitra.up.nic.in... |
As Per Janhit Guarantee Act (working days) |
Red Orange Green White |
As Per Indian Partnership ACT |
Uttar Pradesh |
| Uttar Pradesh Fire Services |
SC05001 |
Completion of NO OBJECTION CERTIFICATE of Fire Service |
1) Key Plan ( A Key Plan is a small schematic representation of a large floor plan. it shows the location of plot.)\n2) Section Plan \n3)Floor wise Fire Fighting Plan (The Floor wise Fire Fighting Plan covers the floor wise fires safety that can occur. what type of fire extinguishers/ equiepment will be used in which cases. which emergency routes have to be followed in the case of fire breakout. etc)\n4) All Fire Fighting Plan \n5) Front Elevation (A Front Elevation or a Building Plan is a straight-on view of the building as if you were looking at it from a perfectly centered spot on the same plane. And it shows the front height of building)\n6) Side Elevation (The Side View or Elevation shows the length and height of the budding.)\n7) Site Plan(A Site Plan usually shows a building footprint. travelways, parking. drainage facilities, sanitary sewer lines, water lines, trails. lighting, and landscaping and garden elements.)\n8) All Floor-Wise Plan (All Floor-Wise Planis a simple two-dimensional line drawing showing a structure's floor, walls and rooms and exit safety route also.)\n9) Project Report (Project Report must be related to Fire Fighting System & Smoke Extraction.) |
No fee required to avail this NOC |
1. a) The applicant will open the Online Single Window Portal using the address “http://niveshmitra.up.nic.in” \nb) Register in Online portal using their personal Details and Contact Details. \nc) A user id and password will be generated and sent through Email. \nd) Applicant should verify email id and mobile no. \ne) Now using the User id and Password, user should be able to login in Nivesh Mitra portal. \n2. After logging into the Nivesh Mitra portal, the Applicant will fill the Common Application Form and create a new Unit. \n3. Click Apply for Permission, select unit from dropdownlist, Now select Department as Fire and service as “Fire No Objection Certificate” then click on proceed button. Applicant will go ahead and submit the application form for service “Fire No Objection Certificate” \n4. Applicant submit the application then tracker will be start, Now applicant can track the status from Dashboard. \n5. Fire Department scrutiny the application request and if there is any query then department will raise the query otherwise they will start inspection. \n6. Applicant respond on the queries raised by Department within 7 working days . \n7. On the basis of scrutiny report and inspection report, department further uploaded the NoC which is now visible in applicantlogin.\n 8. Applicant open Certificate/ NoC Issued tab and click link to download the NoC. \n9. Here applicant have to share his feedbackbefore downloading the digitally signed NoC. \n10. Applicant Downloads the digitally signed NoC from Nivesh Mitra login |
Regarding raising objection within 07 days \n\n(a) NOC issued by Chief Fire Officer\n FSO : 04 दिन\n CFO : 03 दिन\n (b) NOC issued by Deputy Director\n FSO : 03 दिन\n CFO : 02 दिन\n DD : 02 दिन\n (c) NOC issued by Joint Director\n FSO : 02 दिन\n CFO : 02 दिन\n DD : 01 दिन\n JD : 02 दिन\n\nNote:NOC will have to be generated within 15 days. |
N/A |
Same Process and Documents are applicable for all categories |
Uttar Pradesh |
| Department of Weights and Measures : Legal Metrology |
SC14001 |
Application for the issue of new licenses to the Manufacturer |
1.Photographs, Identity and Address proof of the applicant/partners.\n2.Proof of the Date of Birth of applicant/partners.\n3.Ownership or tenancy document of the proposed premises.\n4.Partnership deed, in case of partnership firms.\n5.Model approval certificate, granted by the Director, Legal Metrology, Govt. of India, if required under Legal Metrology General Rules, 2011 with respect to the proposed weighing and measuring instrument.\n6.NOC from pollution control Board, especially in Taj Trapezium zone.\n7.List of machinery and tools.\n8.Affidavit to state that applicant would adhere to the Legal provisions and the directions issued by the Controller.\n9.Affidavit to state that applicant had neither been punished by any Court nor is any criminal proceeding pending in any court.\n10.Registration document of factory/shop/establishment/municipal trade license, as the case may be.\n11.Copy of GST Registration.\n12.Copy of PAN |
Rs 500 |
Stage - I : District Level - Assigning and forwarding applications\nStage - II : Lab Level - Scrutiny, Inspection and forwarding\nStage - III : Divisional Level - Reviewing and forwarding\nStage - IV : Controller Level - Allowing Fee and Issuing authority |
Stage - I : District Level :- 2 Days\nStage - II : Lab Level :- 15 Days\nStage - III : Divisional Level :- 7 Days\nStage - IV : Controller Level :- 6 Days |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14002 |
Application for issue of New License to Dealer |
1.Photographs, Identity and Address proof of the applicant/partners.\n2.Proof of the Date of Birth of applicant/partners.\n3.Ownership or tenancy document of the proposed premises.\n4.Partnership deed, in case of partnership firms.\n5.Affidavit to state that applicant would adhere to the Legal provisions and the directions issued by the Controller.\n6.Affidavit to state that applicant had neither been punished by any Court nor is any criminal proceeding pending in any court.\n7.Registration document of factory/shop/establishment /municipal trade license, as the case may be.\n8.Copy of GST Registration.\n9.Copy of PAN |
Rs 100 |
Stage - I : District Level - Assigning and forwarding applications\nStage - II : Lab Level - Scrutiny, Inspection and forwarding\nStage - III : Divisional Level - Reviewing, Allowing Fee and Issuing authority |
Stage - I : District Level :- 2 Days\nStage - II : Lab Level :- 21 Days\nStage - III : Divisional Level :- 7 Days |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14003 |
Application for issue of New License to Repairer |
1.Photographs, Identity and Address proof of the applicant/partners.\n2.Proof of the Date of Birth of applicant/partners.\n3.Ownership or tenancy document of the proposed premises.\n4.Partnership deed, in case of partnership firms.\n5.Document regarding the qualification, in the case of electronic weighing machines.\n6.Experience certificate.\n7.List of Machinery and tools.\n8.Affidavit to state that applicant would adhere to the Legal provisions and the directions issued by the Controller.\n9.Affidavit to state that applicant had neither been punished by any Court nor is any criminal proceeding pending in any court.\n10.Registration document of factory/shop/establishment/municipal trade license, as the case may be.\n11.Copy of GST Registration.\n12.Copy of PAN. |
Rs 100 |
Stage - I : District Level - Assigning and forwarding applications\nStage - II : Lab Level - Scrutiny, Inspection and forwarding\nStage - III : Divisional Level - Reviewing and forwarding (upto state level)/ Reviewing, Allowing Fee and Issuing authority (upto division level) \nStage - IV : Controller Level - Allowing Fee and Issuing authority(upto state level) |
Stage - I : District Level :- 2 Days\nStage - II : Lab Level :- 14 Days\nStage - III : Divisional Level :- 10 Days (upto state level)/ 14 Days (upto division level) \nStage - IV : Controller Level :- 4 Days (upto state level) |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14004 |
Renewal for the issue of new licenses to the Manufacturer |
Automatically fetched previous documents |
Rs 500 |
15 Days |
System Auto-Renewal |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14005 |
Renewal for issue of New License to Dealer |
Automatically fetched previous documents |
Rs 100 |
15 Days |
System Auto-Renewal |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14006 |
Renewal for issue of New License to Repairer |
Automatically fetched previous documents |
Rs 100 |
15 Days |
System Auto-Renewal |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14007 |
Application for Registration of Name and Address of Packer/Manufacturer/ Importer |
1.Photographs, Identity and Address proof of the applicant/partners.\n2.Proof of the Date of Birth of applicant/partners.\n3.Copy of GST Registration.\n4.Copy of PAN |
Rs 500 |
Stage - I : District Level - Assigning and forwarding applications\nStage - II : Lab Level - Scrutiny, Inspection and forwarding\nStage - III : Divisional Level - Reviewing and forwarding\nStage - IV : Controller Level - Allowing Fee and Issuing authority |
Stage - I : District Level :- 2 Days\nStage - II : Lab Level :- 15 Days\nStage - III : Divisional Level :- 7 Days\nStage - IV : Controller Level :- 6 Days |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14008 |
Nomination of Director by the company |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14009 |
Verification of Storage Tanks |
First verification1. Copy of purchase Invoice.\n2. Copy of Work Order Invoice.\n3. Copy of Calibration Chart from Original Fabricator.\nRe-verification1. Copy of previous verification/rejection certificate(s). |
INR 50/- for the 1st 100 litre plus INR 7/- for every additional 100 litre or part thereof, subject to maximum INR 5000/- + additional fee @50% of the prescribed fee, for delay |
First verification : Stage - I : District Level - Assigning and forwarding applications\nStage - II : Lab Level - Scrutiny, Reviewing, Allowing Fee, Inspection and Issuing authority \nSecond verification : Stage - I : Lab Level - Scrutiny, Reviewing, Allowing Fee, Inspection and Issuing authority |
First verification : Stage - I : District Level - 2 Days \nStage - II : Lab Level - 13 Days\nSecond verification : Stage - I : Lab Level - 15 Days |
N / A |
N / A |
N / A |
| Department of Weights and Measures : Legal Metrology |
SC14010 |
Verification of Flow Meters |
First verification1. Copy of Photo ID of applicant/owner.\n2. Document of procurement such as purchase invoice/bill/cash memo.\n3. Copy of certificate of Model Approval from GoI.\n4. Copy of installation report.\nRe-verification1. Copy of previous verification/rejection certificate(s). |
Flow rate- upto 100 litres/minute : INR 2000/- above 100 & upto 500 litres/minute: INR 3000/- above 500 litres/minute : INR 5000/- + additional fee @50% of the prescribed fee, for delay of every quarter or part thereof + conveyance as applicable |
First verification : Stage - I : District Level - Assigning and forwarding applications\nStage - II : Lab Level - Scrutiny, Reviewing, Allowing Fee, Inspection and Issuing authority \nSecond verification : Stage - I : Lab Level - Scrutiny, Reviewing, Allowing Fee, Inspection and Issuing authority |
First verification : Stage - I : District Level - 2 Days \nStage - II : Lab Level - 13 Days\nSecond verification : Stage - I : Lab Level - 15 Days |
N / A |
N / A |
N / A |
| Housing Department |
SC17001 |
Building Plan Approval |
1.Architect / Engineer Registration Certificate\n2. Common Affidavit\n3. Calculation sheet of Estimate with affidavit\n4. Previous sanctioned map\n5. Previous sanction letter\n6. Previous sanctioned map challan\n7. Previous sanctioned map receipt\n8. Registry Deed/Up to date Payment certificate from Property\n9. section/Hire Purchase Tenant Agreement\n10. Plot / House Ownership document\n11. Compounding Drawing (In PDF)\n12. Sanctioned map letter copy\n13. Compounding Drawing (In AutoCAD)\n14. Approved layout sanction letter\n15. Mutation Document\n16. Sale Deed/Gift deed/Will Deed any other deed/Mutation document/Lease Deed/POA/Development Agreement/Joint Venture/Consortium Agreement\n17. State Environmental Impact Assesment Committee\n18. Bank Guarantee for EDC\n19. IDC Report\n20. Project Report/Detail Project Report\n21. Certificate of structural engineer\n22. Structural drawing & Design\n23. Structural report and calculations\n24. Structure Safety Certificate |
As per "GO 563 / 8-3-19-26 VIVIDH/ 2017 TC" dated 20-Jun-2019 & as per cost index of different authorities and as per approval of their board meeting as well. |
Step- 1:\na) The applicant shall open the Online Single Window Portal using the address\nb) Register in Online portal using their personal Details and Contact Details.\nc) A password is generated and sent through SMS/Email. Using the User id and Password to log into the online Web portal.\nStep – 2:\nAfter logging into the web portal, the Applicant shall fill the Common Application Form and create Unit.\nStep – 3: \nSelect Apply for Certificate/NOC/Permission, choose unit, select Department “Housing Department” and service “Building Plan Approval” then click on proceed. The applicant will go ahead and submit the application form.\nStep - 4:\nApplicant will click on Fill/View Form & select authority (DA/UPAVP)\nStep -5:\nApplicnat will fill General Information, Applicant Information, Application checklist questions, attach required documents, drawing, fill plot details and geo location. \nStep -6:\nApplicant will click on submit thenafter OTPs will be verified after that map fees & scrutiny fees will be paid.\nStep -7:\nAfter successful payment, applicant will submit the application for online scrutiny.\nStep -8: After online scrutiny of drawing if it is failed in rules then applicant will resubmit it through Nivesh Mitra itself or if it cleared from scrutiny then he will put DSC on resulting pdf and attached the required NOCs (if required) thenafter he will send it to concern DA/UPAVP.\nStep -9: Application shall be processed by DA/UPAVP. Necessary inspection (site inspection, document scrutiny) is done by department. In case of any query/objection, Dept shall raise query within 7 days of submitting application and applicant has to reply on query through Nivesh Mitra portal.\nStep-10:DA/UPAVP process the application and finally approve/reject consent\nStep – 11: Applicant Downloads the Final certificate through Nivesh Mitra portal |
15 Days as per Janhit Guarantee Act |
High Risk |
High rise Residential & All Non Residential |
Uttar Pradesh |
| Housing Department |
SC17002 |
Reapply for Building Plan Approval against rejected Application |
1.Architect / Engineer Registration Certificate\n2. Common Affidavit\n3. Calculation sheet of Estimate with affidavit\n4. Previous sanctioned map\n5. Previous sanction letter\n6. Previous sanctioned map challan\n7. Previous sanctioned map receipt\n8. Registry Deed/Up to date Payment certificate from Property\n9. section/Hire Purchase Tenant Agreement\n10. Plot / House Ownership document\n11. Compounding Drawing (In PDF)\n12. Sanctioned map letter copy\n13. Compounding Drawing (In AutoCAD)\n14. Approved layout sanction letter\n15. Mutation Document\n16. Sale Deed/Gift deed/Will Deed any other deed/Mutation document/Lease Deed/POA/Development Agreement/Joint Venture/Consortium Agreement\n17. State Environmental Impact Assesment Committee\n18. Bank Guarantee for EDC\n19. IDC Report\n20. Project Report/Detail Project Report\n21. Certificate of structural engineer\n22. Structural drawing & Design\n23. Structural report and calculations\n24. Structure Safety Certificate |
As per "GO 563 / 8-3-19-26 VIVIDH/ 2017 TC" dated 20-Jun-2019 & as per cost index of different authorities and as per approval of their board meeting as well. |
Step- 1:\na) The applicant shall open the Online Single Window Portal using the address\nb) Building plan approval will behave like a parent service for "reapply against rejection" service so there is no need to register again or to create a new unit id. \nStep – 2:\nAfter logging into the web portal, the Applicant shall fill go to section "Apply for Certificate/NOC/Permission", choose parent unit, select Department “Housing Department” and service “Reapply against Rejection” then click on proceed. The applicant will go ahead and submit the application form.\nStep - 3:\nApplicant will click on Fill/View Form & select authority (DA/UPAVP)\nStep -4:\nApplicnat will fill/ edit General Information, Applicant Information, Application checklist questions, attach required documents, drawing, fill plot details and geo location. \nStep -5:\nApplicant will click on submit thenafter OTPs will be verified after that map fees & scrutiny fees will be paid.\nStep -6:\nAfter successful payment (if applicable), applicant will submit the application for online scrutiny.\nStep -7: \nAfter online scrutiny of drawing if it is failed in rules then applicant will resubmit it through Nivesh Mitra itself or if it cleared from scrutiny then he will put DSC on resulting pdf and attached the required NOCs (if required) thenafter he will send it to concern DA/UPAVP.\nStep -8: \nApplication shall be processed by DA/UPAVP. Necessary inspection (site inspection, document scrutiny) is done by department. In case of any query/objection, Dept shall raise query within 7 days of submitting application and applicant has to reply on query through Nivesh Mitra portal.\nStep -9:DA/UPAVP process the application and finally approve/reject consent\nStep – 10: Applicant Downloads the Final certificate through Nivesh Mitra portal |
15 Days as per Janhit Guarantee Act |
High Risk |
High rise Residential & All Non Residential |
Uttar Pradesh |
| Housing Department |
SC17003 |
Revalidation(extension of validity) |
1.Architect / Engineer Registration Certificate\n2. Common Affidavit\n3. Calculation sheet of Estimate with affidavit\n4. Previous sanctioned map\n5. Previous sanction letter\n6. Previous sanctioned map challan\n7. Previous sanctioned map receipt\n8. Registry Deed/Up to date Payment certificate from Property\n9. section/Hire Purchase Tenant Agreement\n10. Plot / House Ownership document\n11. Compounding Drawing (In PDF)\n12. Sanctioned map letter copy\n13. Compounding Drawing (In AutoCAD)\n14. Approved layout sanction letter\n15. Mutation Document\n16. Sale Deed/Gift deed/Will Deed any other deed/Mutation document/Lease Deed/POA/Development Agreement/Joint Venture/Consortium Agreement\n17. State Environmental Impact Assesment Committee\n18. Bank Guarantee for EDC\n19. IDC Report\n20. Project Report/Detail Project Report\n21. Certificate of structural engineer\n22. Structural drawing & Design\n23. Structural report and calculations\n24. Structure Safety Certificate |
As per "GO 563 / 8-3-19-26 VIVIDH/ 2017 TC" dated 20-Jun-2019 & as per cost index of different authorities and as per approval of their board meeting as well. |
Step- 1:\na) The applicant shall open the Online Single Window Portal using the address\nb) Register in Online portal using their personal Details and Contact Details.\nc) A password is generated and sent through SMS/Email. Using the User id and Password to log into the online Web portal.\nStep – 2:\nAfter logging into the web portal, the Applicant shall fill the Common Application Form and create Unit.\nStep – 3: \nSelect Apply for Certificate/NOC/Permission, choose unit, select Department “Housing Department” and service “Revalidation” then click on proceed. The applicant will go ahead and submit the application form.\nStep - 4:\nApplicant will click on Fill/View Form & select authority (DA/UPAVP)\nStep -5:\nApplicnat will fill General Information, Applicant Information, Application checklist questions, attach required documents, fill plot details and geo location. \nStep -6:\nApplicant will click on submit thenafter OTPs will be verified after that map fees will be paid.\nStep -7:\nAfter successful payment, applicant will submit the application to DA/UPAVP.\nStep -8: \nApplication shall be processed by DA/UPAVP. Necessary inspection (site inspection, document scrutiny) is done by department. In case of any query/objection, Dept shall raise query within 7 days of submitting application and applicant has to reply on query through Nivesh Mitra portal.\nStep -9:DA/UPAVP process the application and finally approve/reject consent\nStep – 10: Applicant Downloads the Final certificate through Nivesh Mitra portal |
15 Days as per Janhit Guarantee Act |
High Risk |
High rise Residential & All Non Residential |
Uttar Pradesh |
| Housing Department |
SC17004 |
e-intimation of Plinth level completion |
Site Photograph of Plinth\nSanctioned Map\nAffidavit as per Appendix 18 of Building Bye Laws |
No fees required for this service |
Step- 1:\na) The applicant shall open the Online Single Window Portal using the address\nb) Building plan approval , Map approval service & E-intimation of Commencement of construction will behave like a parent service for "E-intimation of Plinth level completion " service so there is no need to register again or to create a new unit id. \nStep – 2:\nAfter logging into the web portal, the Applicant shall fill go to section "Apply for Certificate/NOC/Permission", choose parent unit, select Department “Housing Department” and service “E-intimation of Plinth level completion” then click on proceed. The applicant will go ahead and submit the application form.\nStep - 3:\nApplicant will click on Fill/View Form & select authority (DA/UPAVP)\nStep -4:\nApplicnat will attachdocuments & submit the form to DA/UPAVP. \nStep -5:\nApplication shall be processed by DA/UPAVP and finally approve. \nStep – 6: \nApplicant Downloads the Final certificate through Nivesh Mitra portal |
5 days as per Janhit guarantee act |
High Risk |
High rise Residential & All Non Residential |
Uttar Pradesh |
| Housing Department |
SC17005 |
e-intimation of commencement of construction |
There is no such documents required for this service as it is just an acknowledgement for starting the work against "building plan & map approval" so the sanctioned application file along with documents is available in this service. |
No fees required for this service |
Step- 1:\na) The applicant shall open the Online Single Window Portal using the address\nb) Building plan approval & Map approval service will behave like a parent service for "E-intimation of Commencement of construction " service so there is no need to register again or to create a new unit id. \nStep – 2:\nAfter logging into the web portal, the Applicant shall fill go to section "Apply for Certificate/NOC/Permission", choose parent unit, select Department “Housing Department” and service “E-intimation of Commencement of construction” then click on proceed. The applicant will go ahead and submit the application form.\nStep - 3:\nApplicant will click on Fill/View Form & select authority (DA/UPAVP)\nStep -4:\nApplicnat will select work commencement date & submit the form to DA/UPAVP. \nStep -5:\nApplication shall be processed by DA/UPAVP and finally approve. \nStep – 6: \nApplicant Downloads the Final certificate through Nivesh Mitra portal |
Timeline not required for this service as this service is just an acknowledgement for starting the work at site |
High Risk |
High rise Residential & All Non Residential |
Uttar Pradesh |
| Housing Department |
SC17006 |
Occupancy cum Completion certificate |
Sale Deed/Gift Deed/Will Deed any other deed/Mutation Document/Lease Deed/ POA/Development Agreement/Joint venture/Consortium Agreement\nDrawing Duly market culvert\nProof of Authorized signatory of applicant\nDuly filled form C of Annexure 3 with Signature\nDuly filled form B of Annexure 3 with Signature\nDrawing duly marked road side plantations\nCertificate of Structural Engineer\nStructural Drawing and Design\nStructural Report and Calculations \nAnnexure - 7,8,9,10 duly signed by owner , architect and structural engineer\nDrainage Drawing\nDrawing duly marked water supply system\nSewerage Drawing\nDrawing Duly Marked Rain Water Harvesting\nElectric Supply Drawing\nAttested copies of receipt of approved building plans\nProof of authorized signatory of applicant\nDuly filled form B of Annexure 6 with Signature\nDuly filled form C of Annexure 3 with Signature |
No fees required for this service |
Step- 1:\na) The applicant shall open the Online Single Window Portal using the address\nb) Building plan approval , Map approval service, E-intimation of Commencement of construction & E-intimation of Plinth level completion will behave like a parent service for "Occupancy cum Completion certificate " service so there is no need to register again or to create a new unit id. \nStep – 2:\nAfter logging into the web portal, the Applicant shall fill go to section "Apply for Certificate/NOC/Permission", choose parent unit, select Department “Housing Department” and service “Occupancy cum Completion certificate” then click on proceed. The applicant will go ahead and submit the application form.\nStep - 3:\nApplicant will click on Fill/View Form & select authority (DA/UPAVP)\nStep -4:\nApplicnat will attachdocuments & submit the form to DA/UPAVP. \nStep -5:\nApplication shall be processed by DA/UPAVP and finally approve. \nStep – 6: \nApplicant Downloads the Final certificate through Nivesh Mitra portal |
25 days as per Janhit guarantee act |
High Risk |
High rise Residential & All Non Residential |
Uttar Pradesh |
| Housing Department |
SC17007 |
Map Approval |
No Additonal Document required.\nAs it (map approval) is a child service for building plan approval / reapply service / revalidation service for obtaining sanctioned drawing & letter. |
As per "GO 563 / 8-3-19-26 VIVIDH/ 2017 TC" dated 20-Jun-2019 & as per cost index of different authorities and as per approval of their board meeting as well. |
Step- 1:\na) The applicant shall open the Online Single Window Portal using the address\nb) Building plan approval / Reapply against rejection / Revalidation service will behave like a parent service for "map approval" service so there is no need to register again or to create a new unit id. \nStep – 2:\nAfter logging into the web portal, the Applicant shall fill go to section "Apply for Certificate/NOC/Permission", choose parent unit, select Department “Housing Department” and service “map approval” then click on proceed. The applicant will go ahead and submit the application form.\nStep - 3:\nApplicant will click on Fill/View Form & select authority (DA/UPAVP)\nStep -4:\nApplicnat will pay the fees from department's website first then only he can proceed for submission of application. \nStep -5:\nAfter successful payment, applicant will submit the application for final approval. \nStep -6:\nApplication shall be processed by DA/UPAVP. Necessary inspection (Payment reconsile) is done by department. \nStep -7:\nDA/UPAVP process the application and finally approve. \nStep – 8: \nApplicant Downloads the Final certificate through Nivesh Mitra portal\n |
2 Days as per Janhit Guarantee Act |
High Risk |
High rise Residential & All Non Residential |
Uttar Pradesh |
| U.P.Expressways Industrial Development Authority(UPEIDA) |
SC53001 |
Land Allotment System |
1. Copy of MoU signed between your organization and UPEIDA\n2. Letter of intent\n3. MSME/Industrial Entrepreneur Memorandum (IEM)\n4. Certification of Incorporation of the company\n5. Memorandum of Association\n6. Article of Association\n7. PAN Card (Self)\n8. PAN Card of Firm\n9. GST Registration Certificate\n10. Certificate from Chartered Accountant as per attached format\n11. ISO Certificate (If Applicable)\n12. Undertaking Certificate from the company as per attached format\n13. Copy of Work Orders for Supply of Products similar to Products proposed in the Application Proposal\n14. Copy of MOU signed for Technology Tie Up executed between the Applicant Firm and Technology Provider\n15. Copy of Work orders of similar Products supplied by the firm in past\n16. Detailed Project Report (DPR), along with Plant Layout and Justification for Land Area requested\n17. The product covered in investment area of Defence and Aerospace Policy First Amendment -2019 clause 2.5 (Yes/No) if yes product Coverd at(1 to 13)\n18. Income Tax Return for last 03 Year\n19. Purchase Order from Leading Companies\n20. E-Adhaar\n21. Partnership Deed duly Notarized\n22. Company Audit Balance Sheet for last 3 years |
A=Processing Fee 50000+18% GST\nB=Land Area*Unit Price\nC=Development Charges 2% OF B\nD=Discount (AS per Rule for Anchor Investor)\nE=Price =(B+C)-D\nBooking Amount =10% of E+A\nRest 90% Payment AS per Department Plan mentioned in Alotment Letter |
1. Nivesh Mitra to IT Cell UPEIDA\n2. IT CELL to Technical Evaluation Committee\n3. Technical Evaluation Committee to Land Allotment Cell\n4. Land Allotment Cell to Land Allotment Committee\n5. Land Allotment Committee to CEO\n6. CEO to LAND Allotment Cell\n7. Land Allotment to IT Cell |
1. Nivesh Mitra to IT Cell UPEIDA (3 Days)\n2. IT CELL to Technical Evaluation Committee (1 Days)\n3. Technical Evaluation Committee to Land Allotment Cell (7 Days)\n4. Land Allotment Cell to Land Allotment Committee (7 Days)\n5. Land Allotment Committee to CEO (7 Days)\n6. CEO to LAND Allotment Cell (3 Days)\n7. Land Allotment to IT Cell (1 Days) |
Green |
Both |
All Defence Node (Agra, Jhansi, Aligarh, Chitrakoot, Lucknow, Kanpur) |
| U.P.Expressways Industrial Development Authority(UPEIDA) |
SC53002 |
Building Plan Approval System |
CHECKLIST -1 B (For buildings other than those on individual residential plots)\n(i) Ownership documents; copies of allotment letter, possession certificate, the lease deed (transfer deed in case of transfer), and dimension plan issued by the authority.\n(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1).\n(iii) Certificate prescribed in Appendix-2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.\n(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.\n(v) Certificate for sanction of Building Plan as per Appendix-4.\n(vi) Where basement is proposed to be constructed, Indemnity bond on Rs. 100/- stamp paper duly attested by a Notary, shall have to be submitted.\n(vii) Specification of proposed building as per Appendix -6.\n(viii) Application for drainage of premises as per Appendix-7.\n(ix) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot No. for which it is submitted.\n(x) Photocopy of receipt of fees deposited, water and sewer connection charges, service connection and ramp charges and such other charges if any as required by the Authority from time to time.\n(xi) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and owner.\n(xii) Certificate of registered structural engineer and owner regarding earthquake resistance of the building as per Appendix 8/A/B/C, where-ever applicable.\n(xiii) Two copies of the drawings giving details of provisions for fire safety, security as per National Building Code.\n(xiv) Approval from the competent authority in case of hazardous buildings.\n(xv) Soft copies of the drawings in floppy/compact disc.\n(xvi) Valid time extension, where-ever applicable.\n(xvii) NOC from Airport Authority if building is more than 30.0 mtrs high.\n(xviii) NOC from Ministry of environment if covered area is more than 20,000sqmtrs.\n(xix) Any other document as may be required by the Authority from time to time.\n(xx) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be |
Building permit fee, completion fees, temporary building permit fees and calculation thereof |
Stage 1 - Preliminary Check by Dealing Assistant\nStage 2 - Scrutiny of Application and drawings by Architectural Assistant\nStage 3 – Site Inspection\nStage 4 – No objection Certificate (NOC) from Land Procurement Cell\nStage 5 - Scrutiny of drawings by Architect Planner/Assistant Architect Planner\nStage 6 – Clearing of observations/objections by Applicant\nStage 7 – Review by Senior Manager (Architecture & Planning)/Chief Architect Planner\nStage 8 – Grant of Building Permit |
Stage 1 - Preliminary Check by Dealing Assistant 3 Working Days\nStage 2 - Scrutiny of Application and drawings by Architectural Assistant 8 working days\nStage 3 – Site Inspection 7 working days\nStage 4 – No objection Certificate (NOC) from Land Procurement Cell\nStage 5 - Scrutiny of drawings by Architect Planner/Assistant Architect Planner 4 working days\nStage 6 – Clearing of observations/objections by Applicant\nStage 7 – Review by Senior Manager (Architecture & Planning)/Chief Architect Planner 3 days\nStage 8 – Grant of Building Permit 1 Day |
Green |
Both |
All Defence Node (Agra, Jhansi, Aligarh, Chitrakoot, Lucknow, Kanpur) |
| U.P.Expressways Industrial Development Authority(UPEIDA) |
SC53003 |
Defence Investment Incentives |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01020 |
Registration of establishment under the Inter State Migrant Workmen (RE/CS) Act, 1979 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01021 |
Renewal of license for contractors under the Inter State Migrant Workmen (RECS) Act 1979 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01022 |
Registration under The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01023 |
Proposed Building Plan under The Factories Act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01024 |
Amendment in registration issued to the Principal Employer under the Contract Labour (Regulation and Abolition Act 1970) |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01025 |
Amendment in registration issued to establishment under the Motor and Transport Workers Act 1961 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01026 |
Amendment in license issued to contractor under Contract Labour (Regulation and Abolition Act) 1970 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01027 |
Amendment in license issued under the Inter State Migrant workmen Act 1979 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01028 |
Amendment in registration issued to the Principal Employer under the Inter State Migrant workmen Act 1979 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01029 |
Amendment in registration issued to establishments under Uttar Pradesh Shops and Commercial Establishment Act 1962 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01030 |
License for contractors under the Inter State Migrant Workmen(RECS) Act 1979 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01031 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01032 |
Amendment for extension in building plan under the factories act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01033 |
Amendment for manager under the factories act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01034 |
Amendment for change in factory name under the factories act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01035 |
Amendment for change in occupier under the factories act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01036 |
Amendment for change in number of workers and power under the factories act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01037 |
RE-apply Approval of plan and permission to construct extend or take into use any building as a factory under the Factories Act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
| Department of Labour |
SC01038 |
Re-apply Registration and grant of license under The Factories Act 1948 |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |
N / A |